Sign in to use the civil tools
They use your NitoCAD account, and they are free.
Sign in through CAD StudioCivil tools
Surface from survey points, alignments, earthworks quantities, drainage and retaining wall checks. SI units.
Criteria used for the pass and fail checks
These limits are yours to set. The starting values are generic round numbers, not any country's standard. Edit the JSON to match the standard your project follows. Set a field to null to skip that check.
Survey points
One point per line. Use a header row (for example id,easting,northing,elevation) or just x,y,z. Commas, tabs, semicolons and spaces all work.
Alignment
Uses the survey points from the first tab. Horizontal: one PI per line as x,y,radius (radius 0 for a sharp corner). Vertical: one PVI per line as station,elevation,curve length.
Road section
Peak flow (rational method)
No rainfall data is built in. Use intensities from your site's records or design tables.
Pipe
Open channel
Box culvert
Cantilever retaining wall
Level backfill and Rankine earth pressure. No water, no seismic load, no passive resistance, no global slope check.